The Detroit Assembly Plant – Mack project encompassed a 2.5 million square-foot manufacturing plant. MCET was responsible for the access control and security systems in this new assembly site. In the project’s life, MCET installed 200 cameras, 30 intercoms, 33 access control panels, and 1 security head end command center. MCET installed 47,000 feet of copper cable, and 71,977 feet of fiber optic cable at the Detroit Assembly Plant – Mack.
Subsidiary:
Motor City Electric Technologies
Client:
Stellantis
Location:
Detroit, MI